Company
history.
Milestones of a journey from a shipyard workshop on the Golden Horn to our fourth factory in Bursa.
Milestones
From Yusuf Ziya Güleray’s years as a craftsman on the Golden Horn to four factories run by three generations: Kocayusuf’s turning points over the years.
From Türkiye’s first sandwich panel press to its first domestic panel press, from the first AutoPIN membrane press to multi-daylight high-speed presses, many firsts were built in Kocayusuf’s workshops.
-
1946
Yusuf Ziya Güleray was working as a craftsman in the Golden Horn shipyards alongside his Greek master Franguli.

-
1959
After leaving master Franguli, Yusuf Ziya Güleray opened his own small workshop and started his business.

-
1961
Kocayusuf was founded.

-
1974
Kocayusuf began manufacturing presses in its workshop for the first time.

-
1980
The first glue spreading machine was built.
-
1982
Electrical-electronics engineer Halit Hakan Güleray joined Kocayusuf as second-generation manager.
-
1985
Kocayusuf produced Türkiye’s first sandwich panel press.

-
1986
Mechanical engineer Erkan Güleray joined Kocayusuf as second-generation manager.
-
1988
Kocayusuf exhibited at its first TÜYAP fair.

-
1991
Civil engineer Zihni Vargel joined the management; Kocayusuf began operating at IMES.
-
1992
Türkiye’s first domestically produced panel press was built.

-
1993
First LIGNA fair, and the first membrane press built in the workshop.

-
1994
Kocayusuf started producing hot press lines.
-
1999
The production facility moved to Dudullu Organized Industrial Zone.

-
2006
The first hot-melt lamination line was produced; Altuğ Vargel joined as third-generation manager.

-
2007
Production of the first AutoPIN membrane press began.
-
2008
First in-house rubber press and mould production.

-
2012
Press production for the ceramics industry began.

-
2020
Production of the first multi-daylight, high-speed press began.

-
2021
Foundations were laid for the 2nd factory in Dilovası.

-
2022
Foundations were laid for the 3rd factory in Dilovası.

-
2024
Foundations were laid for the 4th factory in Bursa, with 6,000 m² of covered area; the factory was completed and started operating the same year.